GOES-P spacecraft being processed in Florida

Jan 16, 2010
On Cape Canaveral Air Force Station in Florida, the core stage of a Delta IV rocket arrives at Launch Complex 37. The rocket's core stage is the first stage mated to the second stage. This United Launch Alliance Delta IV rocket is slated to launch GOES-P developed by NASA for NOAA. Credit: NASA/Jack Pfaller

During the first three weeks in January, the latest in the series of Geostationary Operational Environmental Satellites also known as GOES-P is being processed and prepped for launch. Meanwhile, the first and second stages of the Delta IV rocket that will carry it into orbit, are being assembled on the launch pad.

The GOES-P spacecraft is currently being processed at Astrotech Space Operations in Titusville, Florida. Prior to the holiday break the Payload Attached Fitting (PAF) fit check was successfully completed on December 18, 2009. Functional testing on the spacecraft bus (the satellite) was successfully completed on December 22, 2009.

Over the last couple of weeks, the GOES-P team commenced with instrument testing and cleaning on the Solar X-Ray Imager and the Imager and Sounder. Testing has completed on schedule and performance is as expected.

The first and second stage of the Delta IV rocket were mated in the United Launch Alliance (ULA) Horizontal Integrating Facility on Jan.6. Following the vehicle mate the rocket was transported to the (Pad 37B) at the Cape Canaveral Air Force Station on January 13th. The vehicle was successfully erected and stands ready for further processing and testing. The smaller boosters are expected to be transported to the pad and integrated on January 14-15.

The NASA Team at the Shuttle Landing Facility in Florida poses after GOES-P arrives. Credit: NASA KSC

Andre' Dress, GOES N-P Deputy Project Manager at NASA's Goddard Space Flight Center in Greenbelt, Md. said, "Our team has made incredible strides in the past few weeks. Just coming off the successful launch and check out of GOES O, everyone is ready to go again and we are anxious to see GOES P added to the NOAA constellation."

Explore further: Venus Express spacecraft, low on fuel, does delicate dance above doom below

add to favorites email to friend print save as pdf

Related Stories

Sophisticated weather satellite rockets into orbit

Jun 28, 2009

(PhysOrg.com) -- The latest Geostationary Operational Environmental Satellite, GOES-O, soared into space today after a successful launch from Space Launch Complex 37 at the Cape Canaveral Air Force Station ...

Dawn Arrives in Florida - A Little After Dawn

Apr 10, 2007

The Dawn spacecraft arrived at Astrotech Space Operations in Titusville, Fla., at 9 a.m. EDT today. Dawn, NASA's mission into the heart of the asteroid belt, is at the facility for final processing and launch ...

GOES-O satellite arrives at KSC for final pre-launch testing

Mar 04, 2009

(PhysOrg.com) -- The latest Geostationary Operational Environmental Satellite (GOES) developed by NASA for the National Oceanic and Atmospheric Administration (NOAA), called GOES-O, arrived this morning by a C17 military ...

NOAA-N prime satellite arrives at Vandenberg for launch

Nov 04, 2008

The latest polar-orbiting operational environmental weather satellite developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA, called NOAA-N Prime, arrived Tuesday by C-5A military ...

Recommended for you

Orion on track at T MINUS 1 Week to first blastoff

5 hours ago

At T MINUS 1 Week on this Thanksgiving Holiday, all launch processing events remain on track for the first blast off of NASA's new Orion crew vehicle on Dec. 4, 2014 which marks the first step on the long ...

Bad weather delays Japan asteroid probe lift off

11 hours ago

Bad weather will delay the launch of a Japanese space probe on a six-year mission to mine a distant asteroid, just weeks after a European spacecraft's historic landing on a comet captivated the world.

Manchester scientists boost NASA's missions to Mars

20 hours ago

Computer Scientists from The University of Manchester have boosted NASA space missions by pioneering a global project to develop programs that efficiently test and control NASA spacecraft.

User comments : 0

Please sign in to add a comment. Registration is free, and takes less than a minute. Read more

Click here to reset your password.
Sign in to get notified via email when new comments are made.