NASA Updates Shuttle Atlantis Target Launch Date

Oct 19, 2009

(PhysOrg.com) -- NASA is targeting Nov. 16 for the launch of space shuttle Atlantis' STS-129 mission from the agency's Kennedy Space Center in Florida.

Managers for NASA's Space Operations Mission Directorate and Exploration Systems Mission Directorate met Monday and decided to adjust Atlantis' target launch date to optimize the agency's ability to launch both Ares I-X and Atlantis before the end of the year. The same launch team at Kennedy is supporting both the shuttle and the flight test of the Ares I-X rocket, which is targeted to lift off on Oct. 27. Ares I-X is scheduled to roll out to its launch pad at 12:01 a.m. EDT Tuesday.

Atlantis' new target launch date will give Ares I-X launch opportunities Oct. 27, 28 and 29. NASA has yet to schedule Atlantis' new target liftoff date on the Eastern Range.

The change to Atlantis' targeted launch will affect the launch countdown dress rehearsal for the shuttle's six astronauts. The astronauts arrived at Kennedy on Monday for the Terminal Countdown Demonstration Test and related training. The simulated countdown has been rescheduled to Nov. 3. The astronauts will practice emergency escape and other related training while they are at Kennedy this week and return there Nov. 2 to conclude their rehearsal work.

The agency's Flight Readiness Review meeting for STS-129 is set for Oct. 29. NASA will schedule an official launch date for Atlantis following that meeting.

Provided by NASA

Explore further: SDO captures images of two mid-level flares

add to favorites email to friend print save as pdf

Related Stories

NASA Successfully Tests Parachute for Ares Rocket

Mar 02, 2009

(PhysOrg.com) -- NASA and industry engineers successfully completed the second drop test of a drogue parachute for the Ares I rocket. The test took place Feb. 28 at the U.S. Army's Yuma Proving Ground near Yuma, Ariz.

NASA selects Ares I upper state contractor

Aug 29, 2007

The National Aeronautics and Space Administration has selected The Boeing Co. to provide design and construction support for the Ares I rocket upper stage.

NASA Completes Assembly of Ares I-X Test Rocket

Aug 17, 2009

(PhysOrg.com) -- For the first time in more than a quarter-century a new space vehicle stands ready in NASA's Kennedy Space Center Vehicle Assembly Building. The Ares I-X rocket, its simulated crew module ...

NASA modifies launch vehicle contract

Oct 05, 2006

NASA is extending a contract with ATK Thiokol of Brigham City, Utah, to continue developing the first stage for the Ares I crew launch vehicle.

Recommended for you

SDO captures images of two mid-level flares

Dec 19, 2014

The sun emitted a mid-level flare on Dec. 18, 2014, at 4:58 p.m. EST. NASA's Solar Dynamics Observatory, which watches the sun constantly, captured an image of the event. Solar flares are powerful bursts ...

Why is Venus so horrible?

Dec 19, 2014

Venus sucks. Seriously, it's the worst. The global temperature is as hot as an oven, the atmospheric pressure is 90 times Earth, and it rains sulfuric acid. Every part of the surface of Venus would kill you ...

Image: Christmas wrapping the Sentinel-3A antenna

Dec 19, 2014

The moment a team of technicians, gowned like hospital surgeons, wraps the Sentinel-3A radar altimeter in multilayer insulation to protect it from the temperature extremes found in Earth orbit.

Video: Flying over Becquerel

Dec 19, 2014

This latest release from the camera on ESA's Mars Express is a simulated flight over the Becquerel crater, showing large-scale deposits of sedimentary material.

User comments : 0

Please sign in to add a comment. Registration is free, and takes less than a minute. Read more

Click here to reset your password.
Sign in to get notified via email when new comments are made.