NASA Successfully Tests Parachute for Ares Rocket

Mar 02, 2009

(PhysOrg.com) -- NASA and industry engineers successfully completed the second drop test of a drogue parachute for the Ares I rocket. The test took place Feb. 28 at the U.S. Army's Yuma Proving Ground near Yuma, Ariz.

The Ares I, the first launch vehicle in NASA's Constellation Program, will send explorers to the International Space Station, the moon and beyond in coming decades. The drogue parachute is a vital element of the rocket's deceleration system; it is designed to slow the rapid descent of the spent first-stage motor that will be jettisoned by the Ares I during its climb to space. The parachute will permit recovery of the reusable first-stage motor for use on future Ares I flights. The first-stage solid rocket motor will power the Ares I rocket for the first two minutes of launch.

This was the seventh in an ongoing series of flight tests supporting development of the Ares I parachute recovery system, which includes a pilot chute, drogue and three main parachutes. Researchers dropped the 68-foot-diameter drogue parachute and its 50,000-pound load, which simulates the rocket's spent first-stage motor, from a U.S. Air Force C-17 aircraft flying at an altitude of 25,000 feet. The parachute and all test hardware functioned properly and landed safely.

The parachutes being developed for the Ares I recovery system are similar to those used for the four-segment space shuttle boosters, but they have been redesigned to accommodate new requirements of the Ares I first stage. The Ares I will have a five-segment solid rocket booster that will move faster and fall from a higher altitude than the shuttle boosters.

Engineers from NASA's Marshall Space Flight Center in Huntsville, Ala., manage the team that conducted the test. ATK Launch Systems near Promontory, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is responsible for design, development and testing of the parachutes at its facilities at NASA's Kennedy Space Center in Florida.

NASA's Johnson Space Center in Houston manages the Constellation Program, which includes the Ares I rocket, the Ares V heavy-lift launch vehicle, the Orion crew spacecraft and the Altair lunar lander. Marshall manages the Ares Projects. The U.S. Army's Yuma Proving Ground provides the test range, support facilities and equipment to NASA for parachute testing.

Provided by NASA

Explore further: 'Flying saucer': NASA live-streamed Low-Density Supersonic Decelerator test

Related Stories

NASA tests Orion's parachute performance over Arizona

Apr 25, 2014

(Phys.org) —The team designing the parachute system for NASA's Orion spacecraft has demonstrated almost every parachute failure they could imagine. But on April 23, they tested how the system would perform ...

NASA puts Orion backup parachutes to the test

Dec 21, 2012

(Phys.org)—NASA completed the latest in a series of parachute tests for its Orion spacecraft Thursday at the U.S. Army Yuma Proving Ground in southwestern Arizona, marking another step toward a first flight ...

Recommended for you

ESA's planetary defence test set for 2020

10 hours ago

If an asteroid were spotted headed towards Earth, what could humanity do about it? ESA's latest mission is part of a larger international effort to find out.

Brief moon eclipse coming April 4

16 hours ago

A brief total eclipse of the Moon may be visible on April 4 to skywatchers in western North America, Australia and East Asia, astronomers say.

User comments : 0

Please sign in to add a comment. Registration is free, and takes less than a minute. Read more

Click here to reset your password.
Sign in to get notified via email when new comments are made.