Image: Training for Sentinel-2A launch

Image: Training for Sentinel-2A launch
Credit: ESA/L. Guilpain

On 25 February, the Sentinel-2A Mission Control Team at ESOC, ESA's mission operations centre, Darmstadt, Germany, commenced simulation training for the critical launch and early orbit phase.

Simulations are a crucial aspect of launch preparations at ESOC. The main objective of any campaign is to train the , which comprises the flight control team, supporting specialists from flight dynamics, ground systems, the ESTEC project team, and the satellite manufacturer.

In practise, this means that a series of intensive, real-time mission scenarios are rehearsed again and again, until the integrated team are able to handle all routine as well as unplanned situations.

Simulations cover a wide range of scenarios, from before lift-off until the satellite enters the correct orbit with all systems functioning as expected. Failures in systems on board the satellite and in the ground systems are also simulated so as to train the team to recover from any emergency.

Teamwork is honed to a sharp edge; each engineer on the team knows their role, and has an in-depth knowledge of the satellite and ground systems for which they're responsible.

"Simulations are an exciting time for the team, culminating in one of the highlights of any mission, the launch," says Deputy Spacecraft Operations Manager Michelle Collins, pictured above.

"The shared – and sometimes high pressure – experiences help build a sense of trust and camaraderie across all the teams, and ensure that we're prepared for anything!"

The Sentinel-2A completed integration at IABG, in February and will be shipped to Europe's Spaceport in Kourou, French Guiana, in mid-April for launch expected on 12 June.

Citation: Image: Training for Sentinel-2A launch (2015, March 4) retrieved 19 April 2024 from https://phys.org/news/2015-03-image-sentinel-2a.html
This document is subject to copyright. Apart from any fair dealing for the purpose of private study or research, no part may be reproduced without the written permission. The content is provided for information purposes only.

Explore further

Sentinel-1 controllers ready for hectic first days

23 shares

Feedback to editors