ITER superconductor production nears completion

The single largest superconductor procurement in industrial history is drawing to a successful close. An eight-year campaign to produce the superconductors for ITER's powerful magnet systems is in its final stages, with nearly ...

dateSep 17, 2015 in General Physics
shares41 comments 0

ITER blanket technology approved

( —The design of the ITER blanket system, a crucial technology on the way to fusion power, has been approved and is now ready to proceed to the manufacturing stage. "The development and validation of the final ...

dateApr 25, 2013 in General Physics
shares0 comments 7

ITER has arrival

On Monday 3 June the first ITER load made its way from the docks in Fos-sur-Mer, near Marseille, to the ITER construction site. Its precious cargo: 14.5 tons of copper conductor manufactured in China. The 737-metre copper ...

dateJun 05, 2013 in General Physics
shares0 comments 0