NASA and ATK successfully test five-segment solid rocket motor (w/ Video)

Aug 31, 2010
NASA and ATK successfully test five-segment solid rocket motor
Ignition of Development Motor-2 during testing. Credit: NASA

(PhysOrg.com) -- With a loud roar and mighty column of flame, NASA and ATK Aerospace Systems successfully completed a two-minute, full-scale test of the largest and most powerful solid rocket motor designed for flight. The motor is potentially transferable to future heavy-lift launch vehicle designs.

The stationary firing of the first-stage development solid rocket motor, dubbed DM-2, was the most heavily instrumented solid rocket motor test in NASA history. More than 760 instruments measured 53 test objectives.

Prior to the static test, the solid rocket motor was cooled to 40 degrees Fahrenheit to verify the performance of new materials and assess motor performance at low temperatures during the full-duration test. Initial test data showed the motor performance met all expectations.

"For every few degrees the temperature rises, burns slightly faster and only through robust ground testing can we understand how material and motor performance is impacted by different operating conditions," said Alex Priskos, first stage manager for Ares Projects at NASA's Marshall Space Flight Center in Huntsville, Ala. "Ground-testing at temperature extremes pushes this system to its limits, which advances our understanding of five-segment solid rocket motor performance."

This video is not supported by your browser at this time.

The first-stage solid rocket motor is designed to generate up to 3.6-million pounds of thrust at launch. Information collected from this test, together with data from the first development motor test last year, will be evaluated to better understand the performance and reliability of the design.

Although similar to the solid that help power the space shuttle to orbit, the five-segment development motor includes several upgrades and technology improvements implemented by NASA and ATK engineers. Motor upgrades from a shuttle booster include the addition of a fifth segment, a larger nozzle throat, and upgraded insulation and liner. The motor cases are flight-proven hardware used on shuttle launches for more than three decades. The cases used in this ground test have collectively launched 48 previous missions, including STS-1, the first shuttle flight.

After more testing, the first-stage solid rocket motor will be certified to fly at temperature ranges between 40-90 degrees Fahrenheit. The solid rocket motor was built as an element of NASA's Constellation Program and is managed by the Ares Projects Office at Marshall. ATK Aerospace Systems, a division of Alliant Techsystems of Brigham City, Utah, is the prime contractor.

Explore further: Bad weather delays Japan asteroid probe lift off

add to favorites email to friend print save as pdf

Related Stories

NASA and ATK Successfully Test Ares First Stage Motor

Sep 10, 2009

NASA and industry engineers lit up the Utah sky Thursday with the initial full-scale, full-duration test firing of the first stage motor for the Ares I rocket. The Ares I is a crew launch vehicle in development for NASA's ...

Successful Rocket Motor Test Helps NASA's Shuttle and Ares I

Nov 02, 2007

NASA's Space Shuttle Program successfully fired a four-segment reusable solid rocket motor Thursday, Nov. 1, at a Utah test facility. The two-minute test provided important information for continued launches of the shuttle ...

NASA Successfully Completes Solid Rocket Motor Test

Mar 11, 2006

NASA's Space Shuttle Program successfully fired a full-scale, full-duration reusable solid rocket technical evaluation motor Thursday, March 9, at a Utah test facility. The two-minute static, or stationary, ...

Ares I Five Segment Development Motor on the Move

Apr 20, 2009

(PhysOrg.com) -- On April 16, NASA moved the first segment of the Ares I rocket's five segment development motor, or DM-1, from ATK Space System's production facility in Promontory, Utah, to the nearby test ...

Recommended for you

Orion on track at T MINUS 1 Week to first blastoff

13 hours ago

At T MINUS 1 Week on this Thanksgiving Holiday, all launch processing events remain on track for the first blast off of NASA's new Orion crew vehicle on Dec. 4, 2014 which marks the first step on the long ...

Bad weather delays Japan asteroid probe lift off

19 hours ago

Bad weather will delay the launch of a Japanese space probe on a six-year mission to mine a distant asteroid, just weeks after a European spacecraft's historic landing on a comet captivated the world.

Manchester scientists boost NASA's missions to Mars

Nov 27, 2014

Computer Scientists from The University of Manchester have boosted NASA space missions by pioneering a global project to develop programs that efficiently test and control NASA spacecraft.

User comments : 0

Please sign in to add a comment. Registration is free, and takes less than a minute. Read more

Click here to reset your password.
Sign in to get notified via email when new comments are made.