NASA Gives 'Go' for Space Shuttle Launch on March 11

Mar 06, 2009
On Launch Pad 39A at NASA's Kennedy Space Center in Florida, a technician holds one of space shuttle Discovery's gaseous hydrogen flow control valves after its removal. Two of the three valves being removed will undergo detailed inspection. Photo Credit: NASA/Kim Shiflett

(PhysOrg.com) -- NASA managers completed a review Friday of space shuttle Discovery's readiness for flight and selected the official launch date for the STS-119 mission. Commander Lee Archambault and his six crewmates are now scheduled to lift off to the International Space Station at 9:20 p.m. EDT on March 11.

Discovery's launch date was announced following Friday's Flight Readiness Review. During the meeting, top NASA and contractor managers assessed the risks associated with the mission and determined the shuttle's equipment, support systems and procedures are ready for flight.

The review included a formal presentation of the shuttle's flow control valve work, initiated after NASA identified damage to a valve on shuttle Endeavour during its November 2008 flight. Using a detailed inspections, there are three valves that have been cleared of crack indications now installed in Discovery to support the STS-119 mission.

The three flow control valves, one for each space shuttle main engine, channel gaseous hydrogen from the engines through the main propulsion system and back to the external fuel tank. This flow regulation maintains the tank's structural integrity and delivers liquid hydrogen to the engines at the correct pressure.

Discovery's STS-119 flight will deliver the space station's fourth and final set of solar array wings, completing the station’s truss, or backbone. The arrays will provide the electricity to fully power science experiments and support the station's expanded crew of six in May. The 14-day mission will feature four spacewalks to help install the S6 truss segment to the starboard, or right, side of the station and the deployment of its solar arrays. The flight also will replace a failed unit for a system that converts urine to potable water.

Archambault will be joined on STS-119 by Pilot Tony Antonelli and Mission Specialists Joseph Acaba, Steve Swanson, Richard Arnold, John Phillips and Japan Aerospace Exploration Agency astronaut Koichi Wakata. Wakata will replace space station crew member Sandra Magnus, who has been aboard the station for more than four months. He will return to Earth during the next station shuttle mission, STS-127, targeted to launch in June 2009.

Former science teachers Acaba and Arnold are now fully-trained NASA astronauts. They will make their first journey to orbit on the mission and step outside the station to conduct critical spacewalking tasks.

Provided by NASA

Explore further: NASA asteroid defense program falls short: audit

add to favorites email to friend print save as pdf

Related Stories

End dawns for Europe's space cargo delivery role

Jul 27, 2014

Europe will close an important chapter in its space flight history Tuesday, launching the fifth and final robot ship it had pledged for lifeline deliveries to the International Space Station.

Astronauts to test free-flying "housekeeper" robots

Jul 21, 2014

(Phys.org) —Inspired by science fiction, three bowling ball-size free-flying Synchronized Position Hold, Engage, Reorient, Experimental Satellites (SPHERES) have been flying inside the International Space ...

Recommended for you

India's spacecraft 'on target' to reach Mars

15 hours ago

An Indian spacecraft is on course to reach Mars, an official said Monday, following a 666-million-kilometre voyage that could see New Delhi's low-cost space programme win Asia's race to the Red Planet.

Rosetta's lander Philae will target Site J

17 hours ago

(Phys.org) —Rosetta's lander Philae will target Site J, an intriguing region on Comet 67P/Churyumov–Gerasimenko that offers unique scientific potential, with hints of activity nearby, and minimum risk ...

User comments : 0