Saturday Spacewalk to Complete Harmony Hookup to Station

Nov 23, 2007
Saturday Spacewalk to Complete Harmony Hookup to Station
Expedition 16 Commander Peggy Whitson (upper left) and Flight Engineer Dan Tani work outside the International Space Station during Tuesday's spacewalk. Image credit: NASA TV

A 6-hour, 30-minute spacewalk by International Space Station Commander Peggy Whitson and Flight Engineer Dan Tani will continue the external outfitting of the Harmony node in its new position in front of the U.S laboratory Destiny.

The spacewalk is scheduled to begin at 6 a.m. EST Saturday from the U.S. airlock Quest. As was the case in the Nov. 20 spacewalk, Whitson, the lead spacewalker, will wear the suit with the red stripes while Tani will be in the suit with the barber-pole stripes.

After leaving the airlock and setting up tools and equipment, Whitson will remove, vent and stow an ammonia jumper, part of a temporary cooling loop. Removing it allows connection of the hookup of the permanent Loop B ammonia cooling loop on a second fluid tray on the station's exterior.

Tani meanwhile will configure tools, then remove two fluid caps to prepare for connection of that permanent cooling Loop B. Next he'll relocate an articulated portable foot restraint, which offers spacewalkers a place to secure their feet, from the U.S. laboratory Destiny's port side to the lower face of the lab's forward endcone.

As in the Nov. 20 spacewalk, much of this outing will be devoted to work with a fluid tray, this time Harmony's Loop B fluid tray. The 300-pound, 18.5-foot tray will be moved from its temporary position on the S0 truss, at the center of the station's main truss, to Destiny, atop the port avionics tray.

As they did with the Loop A tray Nov. 20, they'll use a kind of relay technique, one moving ahead and attaching tethers to be ready to receive the tray, then the other moving farther forward to take the next handoff.

Once they reach the installation point they'll bolt down the tray, then hook up its six fluid line connections, two at S0, two at the tray and two in between.

Whitson will move to the starboard side of Harmony. There she will remove launch restraints from latch petals of a common berthing mechanism. Those petals will initially attach the European Space Agency laboratory Columbus, enabling bolts to be driven to secure it to its permanent station home.

Tani, meanwhile, will remove one of the 22 covers of the starboard Solar Alpha Rotary Joint and do an inspection similar to the one he did during his spacewalk during the STS-120 mission. He will take digital pictures of the joint and collect samples of any debris there.

He will return the cover to the airlock, leaving the joint available for a video survey by a camera on the station's robotic Canadarm2. That survey will be done after the STS-122 mission and will involve at least one full rotation of the suspect joint, which has experienced vibration and increased electrical current draw.

One or more get-ahead tasks may be done if time permits.

The two spacewalkers will do the standard cleanup process and then enter the airlock. The beginning of its repressurization will mark the official end of the spacewalk.

Source: NASA

Explore further: Manchester scientists boost NASA's missions to Mars

add to favorites email to friend print save as pdf

Related Stories

Expedition 16 Completes Spacewalk

Nov 20, 2007

International Space Station Commander Peggy Whitson and Flight Engineer Dan Tani wound up a 7-hour, 16-minute spacewalk to outfit the Harmony node in its new position in front of the U.S laboratory Destiny ...

Spacewalkers to Hook Up Harmony at its New Location

Nov 16, 2007

A 6-hour, 40-minute spacewalk by International Space Station Commander Peggy Whitson and Flight Engineer Dan Tani will begin the external outfitting of the Harmony node in its new position in front of the ...

Recommended for you

ESA image: The gold standard

7 hours ago

The Eutelsat-9B satellite with its EDRS-A payload is shown in the anechoic test chamber of Airbus Defence and Space in Toulouse, France, having completed its final antenna pattern tests today.

Frost-covered chaos on Mars

7 hours ago

Thanks to a break in the dusty 'weather' over the giant Hellas Basin at the beginning of this year, ESA's Mars Express was able to look down into the seven kilometre-deep basin and onto the frosty surface ...

Rosetta's comet: In the shadow of the coma

14 hours ago

This NAVCAM mosaic comprises four individual images taken on 20 November from a distance of 30.8 km from the centre of Comet 67P/C-G. The image resolution is 2.6 m/pixel, so each original 1024 x 1024 pixel ...

User comments : 0

Please sign in to add a comment. Registration is free, and takes less than a minute. Read more

Click here to reset your password.
Sign in to get notified via email when new comments are made.