Ariane rocket puts telecom satellites into orbit

Dec 21, 2008
The Ariane 5 ECA for flight V186 waits on the launch pad on 20 December 2008. The multi-role telecommunications satellites Hot Bird 9 and W2M were carried into geostationary transfer orbits shortly after this picture was taken. Credits: ESA/CNES/Arianespace/Activité Photo Optique Video CSG

(PhysOrg.com) -- Yesterday evening, an Ariane 5 ECA launcher lifted off from Europe’s Spaceport at Kourou, in French Guiana, on its mission to place two multi-role telecommunications satellites into geostationary transfer orbits.

Lift-off of flight V186 took place at 23:35 CET/Paris on 20 November (22:35 UTC/GMT; 19:35 UTC-3/Kourou). The satellites were accurately injected into the correct transfer orbits about 30 minutes later.

The payload comprised Hot Bird 9, which will deliver television signals and interactive services to direct-to-home antennas and cable networks throughout Europe, North Africa and the Middle East, and W2M, which will provide television broadcasting and data network services to the same regions using a fixed antenna, while a steerable beam will be re-oriented in-orbit to deliver services as required. The payload mass was 9220 kg; the satellite masses totalled 8340 kg, with payload adapters and dispensers making up the additional 880 kg.

Arianespace and Europe’s Spaceport are planning as many as eight launches during 2009 – which will make it the busiest year ever for Ariane 5. The ability to sustain high launch rates has already been demonstrated – during the period 12-month period from August 2007 to August 2008, there were nine launches (V177 to V185, inclusive).

The Ariane 5’s cryogenic, liquid fuelled main engine was ignited first. Seven seconds later, the solid fuel rocket boosters were also fired, and a fraction of a second after that, the launch vehicle lifted off.

The solid boosters were jettisoned 2 min: 20 sec after main engine ignition, and the fairing protecting the payload during the climb through the Earth’s atmosphere was discarded at 3 min: 16 sec. The launcher’s main engine was shut down at 8 min: 57 sec; six seconds later, the main cryogenic stage separated from the upper stage and its payload.

Four seconds after main stage separation, the engine of the launcher’s cryogenic upper stage was ignited to continue the journey. The upper stage engine was shut down at 24 min: 55 sec into the flight, at which point the launch vehicle was travelling at 9308 m/s (just over 33 500 km/h) at an altitude of 708 km and the conditions for geostationary transfer orbit injection had been achieved.

At 26 min: 44 sec after main engine ignition, Hot Bird™ 9 separated from the launcher’s upper stage, followed by W2M at 32 min: 10 sec.

Ariane 5 ECA is the latest version of the Ariane 5 launcher. It is designed to place payloads weighing up to 9.6 tonnes into geostationary transfer orbit. With its increased capacity, Ariane 5 ECA can handle dual launches of very large satellites.

Provided by ESA

Explore further: NASA's reliance on outsourcing launches causes a dilemma for the space agency

Related Stories

Airbus developing reusable space rocket launcher

Jun 07, 2015

European aircraft and aerospace giant Airbus has unveiled plans for a reusable space rocket launcher that should be ready in 2025, which the firm says will be radically different from the concept of rival ...

Ariane rocket with two telecom satellites lifts off

Aug 03, 2012

An Ariane 5 rocket carrying two telecommunication satellites launched from the Kourou space centre in French Guiana on Thursday, an Internet broadcast by European operator Arianespace showed.

Ariane rocket launches two Asian satellites

May 16, 2012

An Ariane 5 rocket successfully launched two Asian telecoms satellites into orbit from the Kourou space centre in French Guiana, European operator Arianespace announced.

Recommended for you

Crash test assesses plane emergency locator transmitters

20 hours ago

The Cessna 172 airplane dangled 82 feet in the air – looking almost like it was coming in for a landing, except for the cables attaching it to a huge gantry at NASA's Langley Research Center in Hampton, ...

NASA image: Curiosity's stars and stripes

21 hours ago

This view of the American flag medallion on NASA's Mars rover Curiosity was taken by the rover's Mars Hand Lens Imager (MAHLI) during the 44th Martian day, or sol, of Curiosity's work on Mars (Sept. 19, 2012). ...

User comments : 0

Please sign in to add a comment. Registration is free, and takes less than a minute. Read more

Click here to reset your password.
Sign in to get notified via email when new comments are made.