ISS Crew Members Flex Robotic Arms to Install Stowage Platform

August 14, 2007
ISS Crew Members Flex Robotic Arms to Install Stowage Platform
From left, Mission Specialists Tracy Caldwell and Barbara Morgan and Commander Scott Kelly participate in interviews with news media. Image: NASA

With the use of Canadian-built robotic arms, STS-118 astronauts installed a new stowage platform on the exterior of the International Space Station.

External stowage platform-3 (ESP-3) is the third of its kind to be installed on the station. The first two, however, were attached during spacewalks on previous missions. The stowage platforms are used to hold spacewalk tools and spare equipment.

Mission Specialists Tracy Caldwell and Barbara Morgan used Space Shuttle Endeavour’s robot arm to lift ESP-3 out of the payload bay and to hand it off to the station arm. STS-118 Pilot Charles Hobaugh and Expedition 15 Flight Engineer Clay Anderson used the station arm to attach the platform to the station’s Port 3 truss segment.

Inside the shuttle/station complex, cargo transfers between the two spacecraft continue. Also on tap for today are preparations for STS-118’s third spacewalk scheduled for Wednesday.

The crew began the day at 6:07 a.m. with a wakeup call wishing Caldwell happy birthday.

Source: NASA

Explore further: Endeavour astronauts wrap up second space walk

Related Stories

Endeavour astronauts wrap up second space walk

May 23, 2011

Two astronauts completed a second of four scheduled space walks of the Endeavour shuttle's final mission to the International Space Station on Sunday, the US space agency said.

Robotic arm breakdown adds spacewalk drama

February 28, 2011

Two US astronauts on Monday wrapped up the first spacewalk of the Discovery shuttle mission at the International Space Station after a robotic arm breakdown left one of them stranded for almost 20 minutes.

Leonardo attached to Space Station

March 2, 2011

After a flawless launch last Thursday and a textbook docking on Saturday, the Space Shuttle today delivered the European-built Leonardo Permanent Multipurpose Module to the International Space Station.

First in-orbit space shuttle repair successful (Update)

August 3, 2005

Updated: The STS-114 crew completed heat shield repairs efforts on Space Shuttle Discovery’s underbelly during today’s spacewalk. STS-114 Mission Specialist Steve Robinson removed gap fillers that were protruding from ...

Recommended for you

Fermi finds record-breaking binary in galaxy next door

September 29, 2016

Using data from NASA's Fermi Gamma-ray Space Telescope and other facilities, an international team of scientists has found the first gamma-ray binary in another galaxy and the most luminous one ever seen. The dual-star system, ...

Discovery of an extragalactic hot molecular core

September 29, 2016

Astronomers have discovered a 'hot molecular core', a cocoon of molecules surrounding a newborn massive star, for the first time outside our Galaxy. The discovery, which marks the first important step for observational studies ...

Rosetta measures production of water at comet over two years

September 29, 2016

Over the past two years, Rosetta has kept a close eye on many properties of Comet 67P/Churyumov-Gerasimenko, tracking how these changed along the comet's orbit. A very crucial aspect concerns how much water vapour a comet ...

0 comments

Please sign in to add a comment. Registration is free, and takes less than a minute. Read more

Click here to reset your password.
Sign in to get notified via email when new comments are made.